Assessment · template · CSVtoCSA editorial

Intended Use Template

Version 2.0 · Updated 2026-09-21 · Assessment

Define what users rely on the system to do, the data and outputs involved, the operating boundary, and prohibited uses.

Adapt this template to your intended use, applicable requirements, and approved procedures.

When to use it

During validation planning, requirements development, change assessment, and AI-use approval.

Information needed before starting

  • Process owner’s task description
  • User roles, inputs, outputs and receiving decisions
  • Assessed configuration and excluded uses

Field instructions

  • Users: Identify the system/service or process, version and accountable roles. Specify the scope and supporting record rather than relying on a product name alone.
  • Process: Identify the system/service or process, version and accountable roles. Specify the scope and supporting record rather than relying on a product name alone.
  • Task: Describe the specific task, users, outputs and decisions supported. Identify the assessed environment and limits of reliance.
  • Inputs: Identify authoritative sources, receiving systems and record identifiers. Describe supported formats, units, timing, transformations and error handling.
  • Output: Name the output or controlled record, its recipient and the decision that relies on it. Include acceptance limits or retention needs where relevant.
  • Decision or record affected: Name the output or controlled record, its recipient and the decision that relies on it. Include acceptance limits or retention needs where relevant.
  • Approved environment: Identify the assessed configuration, representative data, selected activities and expected results. Include abnormal and recovery paths and explain remaining coverage gaps.
  • Exclusions and prohibited uses: State what is outside the assessed use or evidence. Explain the consequence and any restriction; do not treat missing information as a pass.
  • Failure response: State the safe or controlled behavior when inputs, services or results are unavailable or incorrect. Define containment, escalation and recovery responsibilities.
  • Reassessment criteria: Define changes or events that reopen this assessment, the responsible role and the required response or review date.

Describe one meaningful regulated use.

Name users, process, inputs, output, and decision authority.

State the approved environment and relevant exclusions.

Make the statement specific enough to drive risk assessment and testing.

Completed fictional example

Fictional teaching example; this is not an executed or approved validation record.

FieldCompleted example
UsersTraining coordinators and manufacturing supervisors
ProcessManufacturing training qualification
TaskDetermine operator eligibility for OP-21
InputsIdentity, role curriculum, completion, and expiry
OutputEligible or not eligible status
Decision or record affectedMES permits or prevents operation start
Approved environmentApproved production sites and role mappings
Exclusions and prohibited usesDoes not establish practical competency or authorize identity provisioning
Failure responseUnavailable status prevents start and invokes escalation
Reassessment criteriaNew role, curriculum-effectivity rule, interface, or override behavior

Blank template

System / record ID: ____________________

Prepared by / date: ____________________

Required review / approval under local procedure: ____________________

FieldYour entry
Users____________________
Process____________________
Task____________________
Inputs____________________
Output____________________
Decision or record affected____________________
Approved environment____________________
Exclusions and prohibited uses____________________
Failure response____________________
Reassessment criteria____________________
Relevant regulations and guidance

These sources apply within their stated scope. The suggested worksheet fields, test designs and fictional decisions are practitioner recommendations, unless a source requirement is expressly identified. Completing a template does not establish compliance.

Computer Software Assurance for Production and Quality Management System Software ↗

Regulatory guidance / GMP guideline · United States · February 2026

Scope: Medical-device manufacturers assuring software used in production or their quality management system.

Relevance: For medical-device production or QMS software, supports selecting assurance activities from intended use, risk and available evidence. It is nonbinding guidance and does not determine other sectors’ obligations.

Status: Final / published · Checked 2026-09-21

Publication identity, scope and status checked against the linked official source. This is not an independent audit of every retained guide statement.

Read source details and applicability →

EudraLex Volume 4, Annex 11 — Computerised Systems ↗

Regulatory guidance / GMP guideline · European Union · January 2011 revision

Scope: Computerised systems supporting activities in the applicable EU pharmaceutical GMP context.

Relevance: For computerised systems used in EU GMP activities, informs lifecycle, supplier and record controls. Confirm applicability to the actual activity; the example does not establish it.

Status: Final / published · Checked 2026-09-21

The Commission index confirms the January 2011 operative revision. The linked PDF could not be retrieved in this check; retained detailed section mappings need review against an authorized copy.

Read source details and applicability →
Was this useful? Leave feedback

Was this resource useful?

Was this template clear and useful? Tell us which instruction or field could be improved.

Loading contribution options…

Questions and moderated discussion

Questions and discussion

Ask a question or share a perspective. Contributions are reviewed before publication.

Loading contribution options…

Suggest a correction

Sent privately to the editorial moderation queue. Your account email and correction are not published as a comment. Do not include confidential or personal information.

Resource: Intended Use Template

Loading sign-in status…

Correction details